Grading

  • Iteration zero: 10 points based on:
    • Having a topic and a customer/business champion
    • Requirements
    • Project plan (in the issue tracker)
    • Development and collaboration infrastructure in use
    • See Evaluation criteria for Iteration 0
  • Intermediate milestone: 10 points based on:
    • Prototype 0.1 (mockup) with release notes and build+install instructions. This doesn’t need to be a "working prototype". It can be a mockup or one component of the system
    • Development and collaboration infrastructure is being used, requirements and issues are updated
    • See Evaluation criteria for Intermediate Milestone
  • Iteration 1: 30 points based on:
    • Prototype 0.2: Incomplete but working prototype with release notes. The functionality of the prototype will be evaluated by lecturers. Feedback will be sought from customer
    • Project process: build+install+test procedure is in place and there is evidence of testing. Development and collaboration infrastructure is being used, requirements and issues are updated.
    • See Evaluation criteria for Iteration 1
  • Iteration 2: 45 points based on:
    • Prototype 1.0 with release notes and user manual to be evaluated by lecturers and customer independently
    • Project progress: build+install+test procedure is in place and there is evidence of testing. Development and collaboration infrastructure is being used, requirements and issues are updated.
    • See Evaluation criteria for Iteration 2
  • Final oral presentation: 5 points to be evaluated by "demo committee".